HDPE pipe fittings

HDPE pipe fittings

EuroPipe along with high quality uPVC pipes, we offers customers a complete solution with various uPVC fittings:

- A wide variety of products.

- European quality standards.

- Easy installation and connection.

- High standard of hygiene.

Description

GENERAL FEATURES

Features Phụ kiện nối & ren Molded HDPE Fittings

Fabricated HDPE Pipe Fittings

  PE 100 or PP Material PE 100 PE 100
Size From DN 20mm through DN 110mm availability From DN 40mm through DN 1200mm availability From DN 110mm through DN 1200mm availability
Pressure Rating 16 bar or other nominal pressures available upon request 10 bar, 12.5 bar, 16 bar or other nominal pressures available upon request 6 Mbar, 10 bar, 16 bar or other nominal
pressures available upon request
Standard ISO 4427-3:2007; BS 1555-3:2010 ISO 4427-3:2007; BS 1555-3:2010

ISO 4427-3:2007; BS 1555:2010; BS 1519

Color Black Black Black and green stripes
Angles     Various angles available upon request
Joint Connect Pipe and Fitting by Adapter or Threaded Joint Connect Pipe and Fitting by Flanged or welded joint Connect Pipe and fttings by welded joint

ADVANTAGES

- Non-toxic: no heavy metal additives, would not be affected by dirt or contaminated by bacterium.

- Corrosion Resistance: resist chemical matters and electron chemical corrosion.

- Low Installation Costs: light weight and ease of installation can reduce installation costs.

- High Flow Capacity: smooth interior walls result in low pressure loss and high volume.

- Longevity: More than 50 years under proper use. In theory it can be more than 100 years.
 

PHYSICAL

APPLICATIONS

- Municipal water supply

- Commercial & Residential water supply

- Industrial liquids transportation

- Irrigation pipeline system

- Sewage systems

- Supply of gaseous fuels (BS1555)

PRESSURE

INSTALLATIONS

I. INSTALLATIONS ELECTRO FUSION JOINT II. BUTT FUSION JOINT INSTALLATIONS

1. Clean and mark

Clean up the connection part, mark the inserting depth.

1. Prepare

Prepare the necessary tools.

2. Scrape

Scrape and polish the joint surface.

2. Clamp and clean

Clamp down the pipe on the jig, clean up the joint parts, mill the joint sides, and then adjust the joint parts to make the misplacement less than 10% of the wall thickness.

3. Align and restrain the fttings to the pipes.

3. Heat

Put the heating panel in between the two ends.

4. Apply electric current

Apply the electric current to the fttings; the joining parts will be heated and melted, turn off the current when there is melt flowing in the observation hole.

4. Join

Remove the heating panel after fnishing heating, join the two heating parts swiftly, increase pressure up to the fusion-joint pressure and keep until it cools down.

5. Cool

Cool without movement or pressure.

5. Complete

Butt Fusion Joint is completed.